Present Installed Generation Capacity (MW) as on 31st October 2023
Public Sector
|
No of Power Plant
|
Installed Generation Capacity (MW)
|
BPDB
|
39
|
6,349
|
APSCL
|
5
|
1,394
|
EGCB
|
3
|
957
|
NWPGCL
|
7
|
1,401
|
B-R Power gen
|
2
|
312
|
RPCL
|
3
|
182
|
Subtotal
|
59
|
10,595 (41%)
|
Joint Venture
|
|
|
BCPCL (JV of NWPGCL & CMC, China)
|
1
|
1,244
|
BCPCL (JV of BPDB & NTPC, India)
|
1
|
617
|
Subtotal
|
2
|
1,861 (7%)
|
Private Sector
|
|
|
IPPs
|
62
|
9,418
|
SIPPs (BPDB)
|
4
|
99
|
SIPPs (REB)
|
9
|
251
|
15 YR. Rental
|
4
|
169
|
3/5 YR. Rental
|
2
|
105
|
Rental(No Electricity No Payment)
|
10
|
797
|
Subtotal
|
91
|
10,839 (42%)
|
Power Import
|
|
|
Bheramara HVDC
|
|
1,000
|
Tripura
|
|
160
|
Jarkhondo (India), Adani Power
|
|
1,496
|
Subtotal
|
|
2,656 (10%)
|
TOTAL
|
152
|
25,951*
|
*Including Captive Power, off grid Renewable Energy & Off grid HFO Total Installed Capacity (25,951+2,800+418+5) =29,174 MW
MAXIMUM DEMAND SERVED
|
15,648MW
|
19-04-2023
|
TRANSMISSION LINES (400 kV) |
1,973Ckt. K.M |
FY-2023 |
TRANSMISSION LINES (230 kV)
|
4,236Ckt. K.M
|
FY-2023
|
TRANSMISSION LINES (132 kV)
|
8,509Ckt. K.M
|
FY-2023
|
GRID SUB-STATION CAPACITY (400/230 kV) |
8,195 MVA |
FY-2023 |
GRID SUB-STATION CAPACITY (400/132 kV) |
2,795 MVA |
FY- 2023 |
GRID SUB-STATION CAPACITY (230/132 kV)
|
16,375 MVA
|
FY- 2023
|
GRID SUB-STATION CAPACITY (230/33 kV)
|
1,390 MVA
|
FY- 2023
|
GRID SUB-STATION CAPACITY (132/33 kV)
|
32,770 MVA
|
FY- 2023
|
DISTRIBUTION LINES (33 KV & BELOW) (only BPDB)
|
49,517 K.M
|
FY-2023
|
CONSUMER NUMBER (BPDB)
|
39,80,433
|
FY-2023
|

PRIMARY GRID SYSTEM OF BANGLADESH
(As on June, 2022)
(Click here for download Grid Map as pdf format.)

|