কনটেন্টটি শেষ হাল-নাগাদ করা হয়েছে: সোমবার, ১৫ জুন, ২০২৬ এ ০১:০৮ PM

মূল পরিসংখ্যান

কন্টেন্ট: পাতা

Present Installed Generation Capacity (MW) as on 31st May 2026

Public Sector

No of Power PlantInstalled Generation Capacity (MW)
BPDB406,461
APSCL51,394
EGCB41032
NWPGCL71,401
B-R Power gen3472
RPCL4392

CPGCBL

1

1150
Subtotal6412,302 (41%)

Joint Venture

BCPCL (JV of NWPGCL & CMC, China)11,244
BCPCL (JV of BPDB & NTPC, India)11,234
RNPL (JV of RPCL & Norinco)11,244
Subtotal33,722(13%)

Private Sector

IPPs6510,602
SIPPs (BPDB)00
SIPPs (REB)3130
15 YR. Rental
3/5 YR. Rental000
Rental(No Electricity No Payment)2141
Subtotal7010,873 (37%)

Power Import

Bheramara HVDC 1,000
Tripura 160
Jarkhondo (India), Adani Power 1,496
Import (Nepal) 40
Subtotal 2,696 (9%)
TOTAL13729,593*

*Including Captive Power, off grid Renewable Energy & Off grid HFO Total Installed Capacity (29,593+2,800+692+7) =33,092 MW

MAXIMUM DEMAND SERVED

17,201MW

20-05-2026
TRANSMISSION LINES (400 kV)3,087Ckt. K.MFY-2025
TRANSMISSION LINES (230 kV)

4,738Ckt. K.M

FY-2025
TRANSMISSION LINES (132 kV)

9,263Ckt. K.M

FY-2025
GRID SUB-STATION CAPACITY (400/230 kV)12,180 MVA FY-2025
GRID SUB-STATION CAPACITY (400/132 kV)3,940 MVAFY-2025
GRID SUB-STATION CAPACITY (230/132 kV)

20,125 MVA

FY-2025
GRID SUB-STATION CAPACITY (230/33 kV)

6,20 MVA

FY-2025

GRID SUB-STATION CAPACITY (132/33 kV)

36,935 MVAFY-2025
DISTRIBUTION LINES (33 KV & BELOW) (only BPDB)

53,278 K.M

FY-2025
CONSUMER NUMBER (BPDB)

44,49,814

FY-2025

PRIMARY GRID SYSTEM OF BANGLADESH

(As on June, 2024)

(Click here for download Grid Map as pdf format.)

এক্সেসিবিলিটি

স্ক্রিন রিডার ডাউনলোড করুন