| CATEGORY - A : RESIDENTIAL LIGHT & POWER Applicable to the electricity service through a single watt hour meter for lighting and appliances used in a dwelling place including related grounds and buildings, having sanctioned load up to 50 KW. CATEGORY - B : AGRICULTURAL PUMPING Applicable to the electricity service through a single watt hour meter for irrigation and drainage of the land for the purpose of cultivation, having sanctioned load up to 50 KW. CATEGORY - C : SMALL INDUSTRIAL Category-C is applicable to the electricity service through a single watt hour meter for small industry, where articles or substances are produced, adopted, manufactured, altered, repaired, ornamented, finished, packaged or treated from raw materials with a view to their use, sale, transport, delivery and disposal having a sanctioned load up to 50 KW. CATEGORY - D : NON-RESIDENTIAL LIGHT & POWER Applicable to the electricity service through a single watt hour meter for hospitals, educational institutions, religious & charitable establishments and all classes of consumers other than those specified under category A, B, C, E & J having sanctioned load up to 50 KW. CATEGORY - E : LT COMMERCIAL Applicable to the electricity service through a single watt hour meter for offices, trading and commercial enterprises such as shops, businesses, hotels & cinema halls, having sanctioned load up to 50 KW. RATE : CATEGORY - F : MEDIUM VOLTAGE GENERAL PURPOSE (11 KV) Applicable to the electricity service through energy and demand meters for all classes consumers having sanctioned load up to 5 MW, where the consumer provides his own sub-station, including transformer, high tension control, protection and power factor correction equipment. CATEGORY - G-1 : EXTRA HIGH VOLTAGE DESA (132 KV) Applicable to the electricity service through energy and demand meter for Dhaka Electric Supply Authority (DESA) receiving power at 132 KV. CATEGORY - G-2 : EXTRA HIGH VOLTAGE GENERAL (132 KV) Applicable to the electricity service through energy and demand meter for all classes of consumer receiving power at 132 KV having sanctioned load above 15 MW upto150 MW, where the consumer provides his own sub-station including transformer, high tension control, protective and power factor correction equipment. CATEGORY - H : HIGH VOLTAGE GENERAL PURPOSE (33 KV) Applicable to the electricity service through energy and demand meter for all classes of consumers other than REB/PBS receiving power at 33 KV, having contracted load up to 15 MW other than REB/PBS where the consumer provides his own sub-station, including transformer and high tension control, protective and power factor correction equipment. In absence of maximum demand meter the maximum demand of the consumers’ categories G2 & H may be calculated as follows : 100% for the first 75 KW of Connected Load 85% for the next 75 KW of Connected Load 75% for the next 75 KW of Connected Load 65% for the next 75 KW of Connected Load 60% for the rest CATEGORY - I : HIGH VOLTAGE BULK SUPPLY FOR RURAL ELECTRIFICATION OF BOARD/ PALLI BIDDYUT SAMITI Applicable to the electricity service through energy and demand meter for REB/PBS receiving power at 33 KV, having contracted load up to 15 MW, where the consumer provides his own transformer, high tension control, protective and power factor correction equipment. CATEGORY - J : STREET LIGHT AND WATER PUMPS. Applicable to the electricity service through a single watt-hour meter for Municipality, WASA and Public Health for the purpose of street lighting and drinking water pumping stations having sanctioned load up to 50 KW. TARIFF (Effective from 1st March, 2007) | ConsumerCategory | Range | Rate/Kwh | Charges | | Demand | Service | Minimum | | Domestic Category-A | 000-100 KWh 101-400 KWh 401 & above for all units in KWh | Tk. 2.50 Tk. 3.15 Tk. 5.25 | Tk. 10.00 Per KW sanctioned load | Tk. 5.00 Per month for single phase & Tk 25.00 per month for 3-phase | Tk. 100 Per month | | Agricultural Pumping Category - B | Flat | Tk. 1.93 | Tk. 35.00 Per KW Per month (for sanctioned load above 30 KW) | 1 Phase Tk. 5.00 3 Phase Tk.25.00 per month | Tk. 125.00 Per H. P. (per month during season) | | Small Industry Category-C | Flat Peak Off peak | Tk. 4.02 Tk. 5.62 Tk. 3.20 | Tk. 35.00 Per KW per month sanctioned load (above 40KW) | Tk. 60.00 per month | Not applicable | | Non-Residential Category-D | | Tk. 3.35 | Tk. 10 Per KW of sanctioned load | 1Phase Tk. 5.00 3 PhaseTk.25.00 | Tk. 100 | | Commercial Category-E | Flat Peak Off peak | Tk. 5.30 Tk. 8.20 Tk. 3.80 | Tk. 20.00 Per KW Per month (for sanctioned load above 40 KW) | Tk. 5.00 Per month for single phase & Tk 25.00 per for 3-phase | Tk. 125 Per KW of sanctioned load per month | | Medium Voltage 11 KV General Category-F | Flat Peak Off Peak | Tk. 3.80 Tk. 6.73 Tk. 3.14 | Tk. 40.00 Per KW of sanctioned load per month | Tk. 350.00 per month | Tk. 80.00 Per KW sanctioned load but not less than Tk. 8000.00 per month | | Extra High Voltage Category-G-1 | DESA-132KV DESA-33KV | Tk. 2.34 Tk. 2.39 | Tk. 35 Per KW of sanctioned load | Not Applicable | Tk. 80.00 Per KW sanctioned load | | Extra High Voltage 132 KV General Category-G-2 | Flat 2300-0600 hrs 0600-1300 hrs 1300-1700 hrs 1700-2300 hrs | Tk. 2.82 Tk. 1.49 Tk. 2.48 Tk. 1.66 Tk. 5.52 | Tk. 35.00 Per KW of sanctioned load. | Tk. 80.00 Per KW sanctioned load | Tk. 60.00 Per KW of connected load | | High Voltage 33 KV General Category-H | Flat Peak Off Peak | Tk. 3.58 Tk. 6.45 Tk. 3.03 | Tk. 35.00 Per KW of sanctioned load per month | Tk. 400.00 Per month | Tk. 80.00 Per KW of connected load | | Category-I-1 | REB 1)132KV 2)33KV -Economically unsolvent -Economically Margin -Economically solvent | Tk. 2.34 Tk. 2.05 Tk. 2.05 Tk. 2.39 | Not Applicable | Tk. 400.00 | Not Applicable | | Category-I-2 | DESCO -132KV -33KV | Tk. 2.34 Tk. 2.39 | Not Applicable | Tk. 400.00 | Not Applicable | | Category-I-3 | WZPDCL -132KV -33KV | Tk. 2.34 Tk. 2.39 | Not Applicable | Tk. 400.00 | Not Applicable | | Category-I-4 | Distribution Of BPDB -132KV -33KV | Tk. 2.34 Tk. 2.39 | Not Applicable | Tk. 400.00 | Not Applicable | | Category-I-5 | Distribution Company in Future -132KV -33KV | Tk. 2.34 Tk. 2.39 | Not Applicable | Tk. 400.00 | Not Applicable | | Street Lights & Pump Category-J | | Tk. 3.86 | Tk. 35 Per KW sanctioned load | Tk. 200.00 | Not Applicable | |